SUCCESS STORIES

2. 17-105 LUBIAN

Oporto viaduct, left track in high-speed line Madrid – Galicia Section: Lubián

SUCCESS STORIES

2. 17-105 LUBIAN

Oporto viaduct, left track in high-speed line Madrid – Galicia Section: Lubián

EqLX6-pb

About the proyect

This is a 173m viaduct with a maximum span of 48 m for heavy railway loads, complete with 2.20-3.00 m variable depth hyperstatic single box beams.

Alvipre has carried out the complete process (turnkey), from manufacturing through to transport, and a complex assembly of all the beams and deck using beam launchers.

 

Constant section beam, variable depth

Zamora

Constant section beam, variable depth

Zamora