{"id":13278,"date":"2022-06-01T12:57:10","date_gmt":"2022-06-01T10:57:10","guid":{"rendered":"https:\/\/alvipre.es\/casos_de_exito\/new-road-bridge-over-la-tordera-bv-6001\/"},"modified":"2022-11-11T16:09:34","modified_gmt":"2022-11-11T15:09:34","slug":"new-road-bridge-over-la-tordera-bv-6001","status":"publish","type":"casos_de_exito","link":"https:\/\/alvipre.es\/en\/casos_de_exito\/new-road-bridge-over-la-tordera-bv-6001\/","title":{"rendered":"New road bridge over La Tordera. BV-6001"},"content":{"rendered":"
Bridge with a longitudinal curved profile, with spans of 51 m, made with curved variable depth beams (1.70\/2.60 m) and ribbed pre-slabs with spans of up to 4.40 m. The hyperstatic connections were made outside the column, implemented using temporary towers and hammers.<\/p>\n
Apart from manufacture and transport, Alvipre also completed the assembly of the bridge in less than 5 weeks.<\/p>\n
<\/p>\n","protected":false},"excerpt":{"rendered":"
Bridge with a longitudinal curved profile, with spans of 51 m, made with curved variable depth beams (1.70\/2.60 m) and ribbed pre-slabs with spans of up to 4.40 m. The hyperstatic connections were made outside the column, implemented using temporary towers and hammers. Apart from manufacture and transport, Alvipre also completed the assembly of the …<\/p>\n