{"id":13277,"date":"2022-06-01T12:56:21","date_gmt":"2022-06-01T10:56:21","guid":{"rendered":"https:\/\/alvipre.es\/casos_de_exito\/viaduct-over-guadalentin-river-in-lorca\/"},"modified":"2022-11-11T16:18:16","modified_gmt":"2022-11-11T15:18:16","slug":"viaduct-over-guadalentin-river-in-lorca","status":"publish","type":"casos_de_exito","link":"https:\/\/alvipre.es\/en\/casos_de_exito\/viaduct-over-guadalentin-river-in-lorca\/","title":{"rendered":"Viaduct over Guadalent\u00edn river in Lorca"},"content":{"rendered":"
116 m viaduct with 43 m spans with V-shaped columns and variable depth hyperstatic single box beams (2.00\/2.25 m).<\/p>\n
Assembling the columns, which was also completed by Alvipre in less than a month, was particularly complex in this case, as the joint between the beams is located in the centre of the column (requiring an intermediate tower).<\/p>\n
<\/p>\n","protected":false},"excerpt":{"rendered":"
116 m viaduct with 43 m spans with V-shaped columns and variable depth hyperstatic single box beams (2.00\/2.25 m). Assembling the columns, which was also completed by Alvipre in less than a month, was particularly complex in this case, as the joint between the beams is located in the centre of the column (requiring an …<\/p>\n