{"id":13276,"date":"2022-06-01T12:55:05","date_gmt":"2022-06-01T10:55:05","guid":{"rendered":"https:\/\/alvipre.es\/casos_de_exito\/marcilla-viaduct-in-high-speed-line-navarre\/"},"modified":"2022-09-05T07:49:33","modified_gmt":"2022-09-05T05:49:33","slug":"marcilla-viaduct-in-high-speed-line-navarre","status":"publish","type":"casos_de_exito","link":"https:\/\/alvipre.es\/en\/casos_de_exito\/marcilla-viaduct-in-high-speed-line-navarre\/","title":{"rendered":"Marcilla viaduct in high-speed line Navarre"},"content":{"rendered":"
854 m viaduct with 48.8 m spans and railway loads completed with variable depth hyperstatic double box beam (2.40\/3.20 m).<\/p>\n
The highly complex transport and assembly were carried out at night by Alvipre staff, who also carried out post-tensioning of the slab.<\/p>\n
<\/p>\n","protected":false},"excerpt":{"rendered":"
854 m viaduct with 48.8 m spans and railway loads completed with variable depth hyperstatic double box beam (2.40\/3.20 m). The highly complex transport and assembly were carried out at night by Alvipre staff, who also carried out post-tensioning of the slab. <\/p>\n","protected":false},"featured_media":13156,"template":"","meta":{"site-sidebar-layout":"default","site-content-layout":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":""},"acf":[],"yoast_head":"\n